Imported coal or local coal: which is cheaper this year?
For many industrial buyers local coal is now cheaper than imported coal per unit of heat. Richards Bay coal averaged about 114 dollars a tonne in July to September, around 133 dollars landed in Pakistan, against about 90 a year earlier.

Why imported coal rose
Richards Bay is the usual reference for Pakistan. The rise from about 90 to about 114 dollars is 24 dollars, just over 26%, and it arrives on top of a dollar bill every importer funds through a bank. With the Strait of Hormuz disrupted since February, gas was short across the region and more plants turned to coal.
The comparison that matters
Compare rupees per million kcal at your gate: delivered price per tonne divided by kcal/kg, times 1,000. Then turn it round and ask what an imported coal must cost delivered to match ours. The chart does that for an imported coal of 6,000 kcal/kg.
- Sor Range48,231 Rs per tonne at your gate
- Chamalang lump50,476 Rs per tonne at your gate
- Duki lump51,750 Rs per tonne at your gate
- Duki run-of-mine51,273 Rs per tonne at your gate
Our delivered Punjab price divided by our kcal/kg, times 6,000. Excludes sales tax. If your landed imported cost, including port, clearing and inland freight, is above the figure, local coal is cheaper per unit of heat. Use the coal price comparison calculator for your own heat values.

Basis, before you compare
Importers often quote net as received heat (NAR) while local labs commonly report gross. The same coal reads lower on the net basis because it leaves out heat lost as steam, so setting one beside the other misleads in either direction. Ask for the basis, the loading and discharge ports, who pays demurrage and who pays for the test, and convert to one basis first. The coal analysis converter handles gross and net.
Where imported coal still wins
It is usually lower in sulphur and more consistent from shipment to shipment, and it arrives in volumes only the largest plants need. A kiln or boiler that gets the same coal for six months can be tuned and left alone; one that changes coal every few weeks pays in operator time and off-spec product.
Where local coal wins
On price, mostly, and on what it takes to buy.
| Point | Imported coal | Balochistan coal by truck |
|---|---|---|
| Smallest lot | A shipment or part-cargo | One truck, 25 tonnes at least |
| Payment | Dollars, usually a letter of credit | Rupees; advance for new buyers, credit for regular ones |
| Lead time | Weeks, with port and clearing | 2 to 3 days from Quetta |
| Sulphur | Usually lower | 3 to 6%; Sor Range lowest |
| Exchange rate risk | Yes | None directly |
Test it on a truck
Buy one or two trucks, run them beside your imported coal in the same unit in the same week, and measure fuel per unit of output. Ask for the lab analysis with each. A plant with a steady base load can also keep imported coal for the part of its fuel that needs low sulphur and take local coal by the truck for the rest, with a second source if a ship is late.
Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.